Bio Terrava Technologies Inc., Stittsville, Ontario

Ontario wood residue, turned into steel-grade biocarbon.

Bio Terrava is developing its first biocarbon and biochar facility in Southern Ontario. Construction and orchard wood that is landfilled or burned today becomes low-ash biocarbon for electric arc furnaces and silicon smelters, plus wood vinegar, process energy and durable carbon removal.

Request the investor pack See the facility plan

Mass balance: 3.3 t of dry wood residue yields 1.0 t biocarbon, 0.3 t wood vinegar, 2.0 t syngas and moisture, about 12.5 GJ; 2.2–2.8 t CO₂e removal credits.3.3 tdry wood residue1.0 tbiocarbon+ 2.2–2.8 t CO₂e removal credits0.3 twood vinegar2.0 tsyngas and moisture, about 12.5 GJ
  • 1.0 t biocarbon
  • 0.3 t wood vinegar
  • 2.0 t syngas and moisture, about 12.5 GJ
  • 2.2–2.8 t CO₂e removal credits
  • 3.3 t dry wood residue
Per tonne of biocarbon. Typical slow-pyrolysis yields; design values to be confirmed at pilot scale.
First facility
Southern Ontario (Niagara region shortlist)
Pilot module
2,000 t/y
Commercial module
10,000 t/y
Seed round
CAD $1.25M

Why Ontario, and why now

Ontario steelmaking is switching furnaces, carbon pricing keeps rising, and there is very little domestic biocarbon to buy.

Ontario steel is moving to electric arc furnaces

Algoma Steel began decommissioning its blast furnace in January 2026 and expects a second EAF online in the second half of 2026, completing its move to electric steelmaking. EAF mills need charge and injection carbon, which today is mostly fossil coke and anthracite.

Source (opens in a new tab)

Industrial carbon pricing keeps rising

The federal benchmark for large emitters is $95 per tonne in 2026, rising to $115 in 2030 and $130 in 2035 under the trajectory published in May 2026. Biogenic carbon lowers a mill’s priced emissions.

Source (opens in a new tab)

Supply is the constraint, not demand

Domestic production of metallurgical-grade biocarbon is small next to the carbon demand of North American EAF and silicon producers. A plant close to Ontario mills avoids long-haul freight on a low-density product.

One feedstock, four revenue lines

Slow pyrolysis splits wood into a solid, a liquid and a gas. Each has a buyer, so no single market carries the plant.

  • Primary product

    Biocarbon for steel and silicon

    Low-ash, low-sulphur charge and injection carbon for electric arc furnaces. Silicon and ferrosilicon smelters already buy wood charcoal, which gives the plant revenue while steel-mill trials run.

  • Second revenue line

    Carbon removal credits

    Biochar that is stored durably can earn certified carbon removal credits on registries such as Puro.earth. Credits are a second revenue line on the same tonne.

  • Co-product

    Wood vinegar

    The condensed pyrolysis liquid is sold to agriculture as a biostimulant. It needs little refining.

  • Lowers operating cost

    Syngas energy

    Non-condensable gas fires the retorts and dryers, so the plant runs largely on its own energy, with surplus power for export where tariffs allow.

Three steps before we build at full scale

Bio Terrava works as an engineering consultancy through each step and takes on EPC delivery of the commercial plant only after the pilot has validated the process.

  1. Evaluate and identify

    Audit the feedstock and its contaminants, confirm the buyer specification, and screen sites for air approvals, logistics and power. This is engineering consultancy work, stamped by a licensed professional engineer.

    Evidence produced: Feedstock audit, offtake spec, site shortlist

  2. Bench-scale testing

    Pyrolyse the real Ontario feedstock in the lab, with independent proximate, ultimate and ash-fusion assays, to fix process conditions that meet the buyer specification.

    Evidence produced: Process window and assay certificates

  3. Pilot before full scale

    A 2,000 t/y pilot module produces bulk sample lots for 6–12 month furnace trials with steel mills. Only after pilot validation do we move to EPC delivery of the commercial plant.

    Evidence produced: Furnace-trial data and signed offtake

Then: EPC delivery of the 10,000 t/y commercial module, released against signed offtake.

Built to the furnace specification

Mills buy carbon against limits on fixed carbon, ash and sulphur. Clean wood residue starts low in ash and sulphur; controlled pyrolysis at 450–550 °C does the rest.

Steel-mill carbon specifications compared with the Bio Terrava design target
Parameter Bio Terrava design target EAF charge carbon EAF injection carbon
Fixed carbon 82–86.5% ≥ 80% ≥ 85%
Ash 3.5–6% < 8% < 5%
Moisture < 3% (pelletised) < 5% < 2%
Volatile matter 8–12% 10–15% < 8%
Sulphur / phosphorus < 0.03% / < 0.01% < 0.10% / < 0.05% < 0.05% / < 0.02%

Design targets, to be confirmed by independent assays at bench and pilot scale.

Where each technology stands

Our advanced media and co-pyrolysis technologies (THPP, Terra BPC, VASCGBC-M and BOFS valorisation) are at Technology Readiness Level 4, validated at bench scale with university partners. Four provisional patent families were filed in April 2026. We are seeking partners to build the pilot.

AMG PYRO slow-pyrolysis kiln, charcoal duty

About 100 kilns of the 10 m³/day class designed and built with Egypt’s EEAA; 10, 34 and 45 m³ units in operation. Steel-grade output from Ontario feedstock is what the pilot will prove.

THPP, Terra BPC, VASCGBC-M, BOFS valorisation

Validated at bench scale with university partners. Four provisional patent families filed April 2026. Seeking pilot partners.

TRL 4: validated in the laboratory. TRL 6: demonstrated at pilot scale. TRL 9: proven in commercial operation.

From pilot to regional hub, one gate at a time

Each phase is sized to the offtake already signed. Capital estimates are management figures and will be refined in front-end engineering.

  1. Phase 0

    Pilot

    Capacity
    2,000 t/y
    Capital estimate
    US$1.8M

    Pilot retort module. Sample lots, independent assays and furnace trials with two steel mills. Opens silicon-smelter sales.

    Moves on when trial results meet the mill specification

  2. Phase 1

    Ontario beachhead

    Capacity
    10,000 t/y
    Capital estimate
    US$9.0M

    First commercial module, fed by construction and demolition wood and orchard-removal wood. First carbon credit issuance.

    Moves on with a 3-year offtake of at least 7,500 t/y

  3. Phase 2

    Regional hub

    Capacity
    30,000 t/y
    Capital estimate
    US$18.5M

    Duplicate retort modules on site or build a second hub near a steel cluster, with pelletising and rail loading.

    Moves on with contracted offtake above 17,500 t/y

Led by an engineer who has built kilns at scale

Medhat Gad, P.Eng., PMP, Founder and Principal Engineer

Thirty-six years of water, wastewater and resource-recovery engineering across Canada, the United States, Egypt and Saudi Arabia. Bio Terrava delivers its engineering under a Certificate of Authorization from Professional Engineers Ontario.

  • About 100 biomass-to-charcoal kilns designed and built with Egypt’s Environmental Affairs Agency
  • Greater Cairo sludge-to-fuel program: 140,000 t/y diverted from landfill to cement-kiln fuel
  • Validation agreements with Western University and McMaster University

More about the team and partners

Questions investors ask first

Short, direct answers. The investor pack has the detail.

What is biocarbon, and how is it different from biochar?

Both are made by heating biomass without oxygen (pyrolysis). Biocarbon is the term used when the product replaces fossil carbon in industry, such as charge or injection carbon in an electric arc furnace, so it must meet tight limits on fixed carbon, ash and sulphur. Biochar usually means the same material used in soil or other durable storage, where it can earn carbon removal credits.

Where will the first facility be built?

The first commercial module is planned for Southern Ontario, with the Niagara region on the shortlist. The site is chosen for feedstock (construction and orchard wood that carries tipping fees today), road and rail access to Ontario steel mills, and provincial approvals. A 2,000 t/y pilot comes first.

What feedstock does the plant use?

Clean construction and demolition wood, orchard-removal wood and forestry residue. These materials are often landfilled or burned. Each feedstock is audited and tested at bench scale before it is accepted.

How mature is the technology?

The slow-pyrolysis kiln design is field-proven: about 100 kilns of the 10 m³/day class were designed and built with Egypt’s Environmental Affairs Agency. Bio Terrava’s advanced media and co-pyrolysis technologies (THPP, Terra BPC, VASCGBC-M and BOFS valorisation) are at TRL 4, validated at bench scale, and we are looking for partners to build the pilot.

How does Bio Terrava reduce project risk?

Every project follows three steps: evaluate the feedstock and buyer specification, run bench-scale tests, then run a pilot before any full commercial plant. Bio Terrava works as an engineering consultancy through these steps and takes on EPC delivery only after the pilot has validated the process.

How can I invest?

Send an inquiry through the investor form. After an introductory call and a confidentiality agreement, qualified investors receive the investor pack and data-room access. Securities are offered only to eligible investors under applicable prospectus exemptions.

Is this website an offer to sell securities?

No. This website is for information only. Any offer is made solely through formal offering documents to eligible investors, in accordance with Canadian securities laws.

Insights

All articles

Talk to us about the Ontario facility

Investors, steel and silicon buyers, and feedstock suppliers: tell us who you are and we will send the right information.

Request the investor pack